Infrastructure, 2014

Ring Line, Vantaa

The components were lowered into the tunnel construction site through the service shaft.

At the airport, the Ring Rail Line runs through a tunnel constructed of precast concrete elements. The tunnel, built by SRV, consists of approximately 2,500 wall elements and 900 vault elements for the ceiling. The decision to use a precast solution for the tunnel was facilitated by the establishment of a functional transport route.