Office Space, 2023

Metsä Group's bioproduct mill, Kemi

The Kemi bioproducts plant represents both Consolis Parma’s largest-ever delivery and the largest investment in the history of Finland’s forest industry. It comprised nearly 20,000 concrete elements, which were manufactured at six Parma plants across Finland.

Consolis Parma was responsible for the delivery and installation of the concrete element frameworks for the majority of the twelve buildings that make up the plant, which is scheduled for completion in the third quarter of 2023.

Every aspect of this massive construction project had to work together seamlessly: high-quality precast products, reliable deliveries, smooth and timely logistics, and safe working conditions on a construction site bustling with installers.

Shared information models were utilized throughout the entire project, from design all the way to the construction site. The architect’s and structural engineer’s information models were transferred directly to Parma’s production system, which streamlined operations and further reduced the potential for errors.

Metsä Fibre served as the project’s general contractor. Other implementation partners included Fimpec Oy, which acted as the project developer; Valmet Oyj; ABB Oy; and AFRY Finland Oy, which was responsible for design.

Photos: Metsä Group, used with permission