Eurakoski Bridge, Kiukainen
The Eurakoski Bridge is the first bridge in Finland to be built using the prestressed beam solution developed by Parma. In this solution, developed in collaboration with SITO, the rapid installation of the precast frame is combined with a seamless, watertight deck slab cast in place. The single-span waterway bridge has a total length of 24 meters and a width of eight meters.
Contractor: Destia